Factories & offices · Chennai

Bonfiglioli

Ventilation for the manufacturing floor and conventional cooling for the offices, planned around the production shift pattern.

Sector
Manufacturing
Programme
Between shifts
Systems
Ventilation, VRF
Status
Completed
Bonfiglioli
Bonfiglioli · Chennai

Shop floor ventilation and office cooling on one site

The shop floor and the office block want opposite things. One needs air changes and heat removal, the other needs comfort cooling, and they sit under the same roof.

We treated them separately rather than compromising on a single system, with the floor on high-volume ventilation and the offices on VRF.

All the floor work was done between shifts. Nothing we did stopped a line.

On site

More from this job

Manufacturing floor
Manufacturing floor
Ventilation control panel
Ventilation control panel
Site walk before shift change
Site walk before shift change

Tell us what needs cooling.

Send us the drawings, the tonnage, or just a photo of the plant room. We will come out, measure up and give you a written quote — no charge for the visit anywhere in Chennai.