Hotels & banquets · Chennai

InterContinental

Ducting, terminal units and commissioning support during fit-out, followed by training for the property's own engineers.

Sector
Hospitality
Stage
Fit-out
Systems
Ducted, FCU
Status
Handed over
InterContinental
InterContinental · Chennai

Fit-out support and handover to the in-house team

We came in during fit-out, working alongside the interiors contractor on a programme that moved every week.

Most of our time went on the ducting and the terminal units above a ceiling that kept changing height. The rest went on commissioning — balancing the air, proving the controls, and recording what was actually installed rather than what was drawn.

At handover we spent two days with the in-house engineering team walking them through the system, because a set of drawings on its own is not a handover.

On site

More from this job

Public area at handover
Public area at handover
Ducting above the corridor ceiling
Ducting above the corridor ceiling
Function room
Function room

Tell us what needs cooling.

Send us the drawings, the tonnage, or just a photo of the plant room. We will come out, measure up and give you a written quote — no charge for the visit anywhere in Chennai.